Here are just a few of
the systems we have installed. Please
contact us for your next
project idea.
New Life Community Baptist Church
This forward-thinking, growing
congregation required an audio, video and lighting system
with emphasis on utilizing the multi-purpose room for
everything from church services, drama presentations to
sporting events. The main speaker system consists of EAW
full range and subwoofer boxes. The church wanted the
ability to have both a central cluster of speakers as well
as left and right stereo capability.
Grove City
Church of the Nazarene
A contemporary Christian church with over
3500 seats, it involves itself with live band productions
and mixed multi-media presentations. The church required a
flexible and versatile audio, video and lighting system.
Mark Wooten and his team were commissioned to perform the
design/build of these systems. Working closely with the
project architect, not only was the technology side of the
design accomplished, assistance with the sanctuary’s room
design and acoustics were implemented as well.
Columbus
Crew Stadium
On June 15, 1994, Columbus, Ohio was introduced as the first of the 10 inaugural Major League Soccer (MLS) clubs.
The Crew forever etched its place in American Sports History
by christening The Columbus Crew Stadium, the country's first
major league stadium built specifically for soccer. For Mark Wooten and his team, the installation of the audio system was an honor. The entire boxed speaker rig was assembled and hoisted on top of the towering Jumbo Tron
scoreboard. The Columbus Crew is pleased with the installation and performance of the audio systems throughout the stadium and we are grateful to be apart of such history in Columbus, OH.